Challenge
Ageing panels and untuned drives caused nuisance trips on the conveyor system during peak shifts.
What we delivered
- Distribution panel rewiring and protection review
- Inverter configuration with motor control tuning
- Site testing with commissioning records
- Handover walkthrough for the facilities team
Outcome
Safe installations, calibrated drives and complete commissioning records — equipment running stably through peak operation.
