Challenge
An ageing controller with undocumented logic made every fault a guessing game and every product changeover slow.
What we delivered
- PLC architecture with documented control logic
- HMI with clear operator interface and tested sequences
- Safety interlocks reviewed and commissioned
- Operator handover with documentation
Outcome
A documented control system with tested sequences — faults traceable, changeovers smoother, operators confident.
